TAED Manufacturing Facility - Casale, Italy

Project Profile

The project scope involved the total detailed mechanical, electrical and instrumentation design to transform an existing PAS Adjunct Powders Plant into a fully computer controlled 7 day, 3 shift TAED manufacturing facility designed to Zone 0 gases and Zone Z(10) dust hazardous area classification.

Plant Description

Location:
Type of Plant:
Total Project Value:

Casale, Italy
TAED manufacturing facility
�5 million

The PDS Deliverables included

  • 25 Equipment/Ducting/Chute G.A's
  • 90 Equipment Data Sheets
  • Electrical and Instrument Specifications
  • Single line, Distribution & Instrument Loop Diagrams
  • PLC I/O Wiring
  • Panel Design
  • Cable Schedules
  • Photo-realistic colour views for design visualisation
  • Training Video for production personnel

Design Statistics

Design delivery:
PDS:
Estimated cost saving over 2D Cad:
28 Weeks
4900 man-hours
10%

TAED Manufacturing Facility