TAED Manufacturing Facility - Casale, Italy
Project Profile
The project scope involved the total detailed mechanical, electrical and instrumentation design to transform an existing PAS Adjunct Powders Plant into a fully computer controlled 7 day, 3 shift TAED manufacturing facility designed to Zone 0 gases and Zone Z(10) dust hazardous area classification.
Plant Description
| Location: Type of Plant: Total Project Value: |
Casale, Italy |
The PDS Deliverables included
-
25 Equipment/Ducting/Chute G.A's
-
90 Equipment Data Sheets
-
Electrical and Instrument Specifications
-
Single line, Distribution & Instrument Loop Diagrams
-
PLC I/O Wiring
-
Panel Design
-
Cable Schedules
-
Photo-realistic colour views for design visualisation
-
Training Video for production personnel
Design Statistics
| Design delivery: PDS: Estimated cost saving over 2D Cad: |
28 Weeks 4900 man-hours 10% |