Lotion Manufacturing Facility - Wales
Project Profile
A multi-disciplined Design & Build Project involving Engineering Design, Procurement, Construction, Commissioning and Validation for a new Lotion Manufacturing Facility. Built to current hygienic standards the facility was designed to be energy & labour efficient, flexible, expandable & produce near zero waste.
The plant was built & commissioned on time and within budget.
Facility Overview
-
SCADA Controlled, InTouch Receipt Batch Handing System
-
Allen-Bradley SLC-500 Series PLC
-
Batch Sizes from 1 cu.m to 25 cu.m
-
Tanker Off-loading and Bulk Material Storage and Distribution
-
Minor Liquids & Powders Storage and Weighing
-
Finished Product Storage and Distribution
-
DI Water Production
-
Fully CIP
-
Effluent Treatment
-
Flexibility due to Mixproof Manifolds
Design Statistics
Design: |
14 Weeks 22 Weeks 8 Weeks �1.85 m |