Lotion Manufacturing Facility - Wales

Project Profile

A multi-disciplined Design & Build Project involving Engineering Design, Procurement, Construction, Commissioning and Validation for a new Lotion Manufacturing Facility. Built to current hygienic standards the facility was designed to be energy & labour efficient, flexible, expandable & produce near zero waste.

The plant was built & commissioned on time and within budget.

Facility Overview

  • SCADA Controlled, InTouch Receipt Batch Handing System
  • Allen-Bradley SLC-500 Series PLC
  • Batch Sizes from 1 cu.m to 25 cu.m
  • Tanker Off-loading and Bulk Material Storage and Distribution
  • Minor Liquids & Powders Storage and Weighing
  • Finished Product Storage and Distribution
  • DI Water Production
  • Fully CIP
  • Effluent Treatment
  • Flexibility due to Mixproof Manifolds

Design Statistics

Design:
Installation:
Commissioning & Training:
Total Project Cost:

14 Weeks
22 Weeks
8 Weeks
�1.85 m