2 x 900 MW Nuclear Power Station - Ling Ao, Guangdong - China
Copy and modify an existing PDS Design of a 900 MW Steam Turbine Hall involving the following deliverables:-
-
Clash Reports
-
1130 no. pipe fabrication isometrics c/w BOM's by system, work unit and individual isometric
-
1550 no. detailed pipe supports together with intelligent BOM reports by project area, system, and individual support.
-
132 no. piping/equipment/electrical panel location GA's
-
Updating & maintaining 60 no. P&ID's
-
Photo-realistic views
-
Walk throughs and fly-arounds transferred to CD and video
Project Size
-
21,000 m of 50ns pipe & below (indicative)
-
24,000 m of 80ns pipe & above
-
540 no. separate lines
-
40 no. piping systems