2 x 600 MW Coal Fired Power Station - Ho Ping - Taiwan
PDS model the “off site” pipe-work and equipment (Site 900m x 300m) including all structures, buildings, roads, drains, coal & ash handling, oil, water, air, steam & gas storage / distribution i.e. all BOP service and process systems, and produce the following design deliverables:-
-
1250 no. pipe fabrication isometrics c/w BOM's by system, work unit and individual isometric
-
200 no. detailed special pipe supports together with BOM reports by project area, system, and individual support.
-
6000 no. standard pipe supports together with BOM reports by project area, system and individual supports
-
184 no. piping GA's, 45 no. civil location GA's, Updating & maintaining 16 no. P&ID's, 200 no. stress isometrics
Project Size
-
21,600 m of 50ns pipe & below (indicative)
-
42,000 m of 80ns pipe & above
-
703 separate Lines
-
15 piping systems