3 x 700 MW Coal Fired Power Station - Manjung - Malaysia
PDS model the “off site” pipe-work and equipment (Site 800m x 450m) including all structures, buildings, roads, drains, coal & ash handling, oil, water, air, steam & gas storage/distribution i.e. all BOP service and process systems, and produce the following design deliverables:-
-
1050 no. pipe fabrication isometrics c/w BOM's by system, work unit and individual isometric
-
170 no. detailed special pipe supports together with BOM reports by project area, system, and individual support.
-
4700 no. standard pipe supports together with BOM reports by project area, system and individual supports
-
150 no. piping GA's. 25 no. civil location GA's
-
Updating & maintaining 24 no. P&ID's
-
220 no. stress isometrics
Project Size
19,000 m of 50ns pipe & below (indicative). 36,000 m of 80ns pipe & above. 600 separate Lines. 14 piping systems.